Quick contact info

We are dedicated to maintaining the highest standards of safety, sustainability, and innovation in all our work, while preserving and enhancing the natural landscapes of the regions we serve.

icon_widget_image 08 8555 2809 icon_widget_image admin@fleurieucivil.com.au icon_widget_image 2 Wright Road Goolwa SA 5214, Australia
Image Alt
Projects

Hamley Bridge

South Australia

Hamley Bridge

Fleurieu Civil & Construction were engaged by SA Water to install 981m of DN300 DICL in Hamley Bridge.

The project included the development of a new service road and the management of local vegetation through thorough environmental considerations.

The construction included:

  • 981m of DN300 DICL pipe (ductil iron cement lined)
  • 48m of DN100 DICL
  • Installation of 3 stop valve assemblies
  • 6 x stop valve assemblies
  • 3 x fire plugs
  • Reinstatement of roads
  • Full system flush, chlorination, and commissioning

The project was executed on time, on budget, and with zero safety events. A great achievement by the team working in a remote environment.

Project Info

Category:
Date: